Projects in progress

1. Procurement and construction of sewage collectors and sewerage network in Vranje  (details)

Purchaser: "JP VODOVOD" Vranje

Contract value: 2,445,696.50 EUR excl. VAT

MPP Jedinstvo is the leader of the consortium together with Veolia Water Solutions & Technologies Ltd. Belgrade and Millennium Team DOO Belgrade signed a contract for the construction of sewage collectors and sewerage network in Vranje.

2. Factory for ammunition completion and packaging  (details)

Purchaser: "Prvi partizan" a.d. Uzice

Contract value: 8.262.160,08 EUR excl. VAT

Execution of architectural construction works on the construction of buildings, roads and drainage channels at the site Dautovac - Bela Zemlja for the needs of the construction of a factory complex for the completion and packaging of ammunition

3. Border crossing Gostun  (details)

Investor: Republic of Serbia - Ministry of Finance - Customs Administration, Belgrade

Purchaser (leading member of the group of bidders): "W.D. CONCORD WEST" DOO, Belgrade

Contract value: 380.737.212,51 RSD without VAT

Completion of works: May 2020

"Works on the construction of GP Gostun between the Republic of Serbia and the Republic of Montenegro, the value of all works 669.889.711,21 RSD without VAT.

MPP Jedinstvo as a member of a group of bidders carries out works on roads, traffic signalization, hydrotechnical, hydraulic and thermotechnical installations. "

4. Production warehouse facility CTP in Kragujevac  (details)

Investor: SMB-GRADNJA d.o.o. Subotica

Contract value: EUR 2,885,181.34 excluding VAT

Completion of works: October 2019

Performing works on installations: thermotechnical, hydrotechnical, compressed air, sprinkler, gas and foam fire extinguishing at production and warehouse facility with total area of 18.000 m2.

5. Gold gondola Zlatibor   (details)

Investor: Municipality of Čajetina

Contract value: 345.940.760,00 RSD without tax

Execution of works on the construction of a panoramic gondola on Zlatibor with accompanying facilities. The route of the gondola, nine kilometers long, connects the center of Zlatibor with the ski center Tornik, through Ribnica Lake, where the interstellar station will be located.

6. Border crossing Kotroman  (details)

Investor: Ministry of Finance, Republic of Serbia

Contract value: 2.174.312,08 EUR without TAX

Completion of works: august 2020

Complete works on the construction of the border crossing Kotroman between the Republic of Serbia and Bosnia and Herzegovina. Works are carried out during the work of the existing border crossing and include the demolition of existing buildings and the construction of new ones.

7. Expansion of the boiler room of "Valjaonica Bakra Sevojno Ad" Sevojno  (details)

Investor: "Valjaonica Bakra Sevojno Ad" Sevojno

Contract value: 242.763,01 EUR without TAX

Completion of works: September 2019

Delivery, installation and commissioning of 8MW hot water boiler with burner on natural gas and other associated equipment with execution of supporting construction and electrical works.

8. Building a commercial building RTV Novi Sad  (details)

Investor: Public media institution "Radio-televizija Vojvodine"

Investor: SMB-GRADNJA d.o.o. Subotica

Contract value: 258.356.189,53 RSD without TAX

Completion of works: September 2019

MPP Jedinstvo as a member of a group of bidders performs works on thermotechnical, hydrotechnical and sprinkler installations.
The building will have five television and six radio multifunctional studios and will have 17,530 square meters, with all the necessary technical and technological accompanying facilities.

9. Construction of the R-6 reservoir and completion of works on the R-5 tank and the execution of works on the associated infrastructure at the warehouse of oil derivatives "Požega" in Požega  (details)

Investor: Republic Directorate for Commodity Reserves

Contract value: 266.969.559,65 RSD without TAX

10. Reconstruction and upgrading of the water treatment plant Berilovac in Pirot  (details)

Investor: JP Vodovod i kanalizacija Pirot

Contract value: 1.386.998,48 EUR without TAX

"Planned activities include:
- Reconstruction and expansion of the filter station,
- Reconstruction of the pump station,
- Construction of a tank of 700 m3,
- Construction of internal roads,
- Construction of a sludge drying area,
- Sinking tank volume of 400 m3 for used water from filter wash, etc. "

11. Shoping mall Zvezdara  (details)

Investor: MPC Properties

General Contractor: SMB-GRADNJA d.o.o. Subotica;

Contract value: 9.761.305,44 EUR without TAX

Completion of works: Spring 2020.

MPP Jedinstvo performs works on thermotechnical, hydrotechnical and sprinkler installations, as well as locksmith works.

The building has a total area of 130,000 square meters with 3 retail levels and over 150 shops, restaurant part, underground garage for 1250 vehicles. The entire investment exceeds the value of 100 million euros.

12. Flue gas desulphurization plant in TENT, Obrenovac  (details)

Investor : Elektroprivreda Srbije 

Contract value: 95 500 000

13. Water supply system Zubin Potok  (details)

Construction of regional water supply system of Zubin Potok Municipality, Kosovska Mitrovica and Zvecan

Contract value: 1.168.145.000 rsd.

14. Water Supply and Sanitation of the Adriatic Coast III Bar Bar, Montenegro  (details)

Contract value: 13.200.000 EUR