Investor: JP Vodovod i kanalizacija Pirot
Contract value: 1.386.998,48 EUR without TAX
“Planned activities include:
– Reconstruction and expansion of the filter station,
– Reconstruction of the pump station,
– Construction of a tank of 700 m3,
– Construction of internal roads,
– Construction of a sludge drying area,
– Sinking tank volume of 400 m3 for used water from filter wash, etc. “