{"id":1181,"date":"2014-01-13T13:35:03","date_gmt":"2014-01-13T12:35:03","guid":{"rendered":"https:\/\/mppjedinstvo.co.rs\/en\/?p=1181"},"modified":"2014-01-13T13:35:03","modified_gmt":"2014-01-13T12:35:03","slug":"bridge-ada-pipeline-dn900","status":"publish","type":"post","link":"https:\/\/mppjedinstvo.co.rs\/en\/2014\/01\/13\/bridge-ada-pipeline-dn900\/","title":{"rendered":"Bridge Ada pipeline DN900"},"content":{"rendered":"<p>Type of works: Execution of works on steel pipeline DN 900, bridge carpenters and cathodic protection<br \/>\nInvestor: GP PORR d.o.o.<br \/>\nContract value: EUR 649,324.43<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Type of works: Execution of works on steel pipeline DN 900, bridge carpenters and cathodic protection Investor: GP PORR d.o.o. Contract value: EUR 649,324.43<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[6],"tags":[],"_links":{"self":[{"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/posts\/1181"}],"collection":[{"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/comments?post=1181"}],"version-history":[{"count":0,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/posts\/1181\/revisions"}],"wp:attachment":[{"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/media?parent=1181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/categories?post=1181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/tags?post=1181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}