{"id":637,"date":"2013-02-07T11:22:52","date_gmt":"2013-02-07T10:22:52","guid":{"rendered":"https:\/\/mppjedinstvo.co.rs\/rs\/?p=637"},"modified":"2013-02-07T11:22:52","modified_gmt":"2013-02-07T10:22:52","slug":"jedinstvo-named-best-bider-for-tender-construction-of-water-supply-and-sewerage-infrastructure-in-bar","status":"publish","type":"post","link":"https:\/\/mppjedinstvo.co.rs\/en\/2013\/02\/07\/jedinstvo-named-best-bider-for-tender-construction-of-water-supply-and-sewerage-infrastructure-in-bar\/","title":{"rendered":"Jedinstvo named best bider for tender Construction of water supply and sewerage infrastructure in Bar"},"content":{"rendered":"<p>The opening of Financial bids submitted in the tender for the construction of water and sewage infrastructure took place at Municipality of Bar on Thursday, 7 February.<br \/>\nThe selection of the best bidders will completed the second stage of the tender procedure within the project \u201cImprovement of water supply and sanitation in the municipality of Bar&#8221;, jointly implemented by local government, JP Vodovod i kanalizacija and Vodacom, in cooperation with the Goverment of Montenegro and German Development Bank (KfW).<br \/>\nDeputy Mayor Dragan Simovic announced bids from three bidders have received in the range of EUR 13.2-17.5m.<\/p>\n<p>&#8220;Jedinstvo from Sevojno gave an offer of EUR 13.2m, Turkish Celtikcioglu EUR 13.5m, and Sade CGTH from France offered EUR 17.5m. The Commission will now verify the correctness of the financial offers. Regarding the fact this project has been implementing in cooperation with the KfW, after its experts offer their opinion on validity of tenders, sum score for technical and financial bids and selection of the best bidder will be made. Finally, municipalities of Bar will sign a contract with the best bidder\u201d, said Simovic.<!--more--><\/p>\n<p>He expressed the hope that the building of the network will start by June 2013, and the deadline for completion of the project is 24 months from the introduction of contractor in the business.<\/p>\n<p>The project is planned for reconstruction and construction of 44km of water supply and sewage systems in rural areas: Polje, Bjeli\u0161i, \u010celuga \u0160u\u0161anj, Ratac, Zagradje, \u010canj, Botun and Iva Novakovic\u2019s coastline, the construction of four sewage pumping stations and submarine outfall on Volujica and Sutomore, as well as construction of a water tank.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The opening of Financial bids submitted in the tender for the construction of water and sewage infrastructure took place at Municipality of Bar on Thursday, 7 February. The selection of the best bidders will completed the second stage of the &hellip; <a href=\"https:\/\/mppjedinstvo.co.rs\/en\/2013\/02\/07\/jedinstvo-named-best-bider-for-tender-construction-of-water-supply-and-sewerage-infrastructure-in-bar\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/posts\/637"}],"collection":[{"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/comments?post=637"}],"version-history":[{"count":0,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/posts\/637\/revisions"}],"wp:attachment":[{"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/media?parent=637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/categories?post=637"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppjedinstvo.co.rs\/en\/wp-json\/wp\/v2\/tags?post=637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}